Uploaded image for project: 'Artifactory Binary Repository'
  1. Artifactory Binary Repository
  2. RTFACT-27188

Recalculate Index of Helm repository is scheduled, but not task is not visible for user

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Open
    • Resolution: Unresolved
    • Affects Version/s: 7.37.14
    • Fix Version/s: None
    • Component/s: Helm
    • Labels:
    • Location:
      External

      Description

      When doing a "Recalculate Index" on a Helm repository in the UI a message pops up and telling "Recalculating index for repository REPO scheduled to run". There is no possibility for a user to see from the UI that the task has started or when to see when it has finished.

      It should be possible to either see with a flag or a field "last recalculated" when the recalculation has passed or, even better, to see what background tasks were scheduled and what their current status is.

      There are maybe some indication in the logs for getting info about the recalculation, but as the task was started in the UI I'd expect to see anything related also in the UI, esp. when not all users have full access to the logs.

        Attachments

          Activity

            People

            Assignee:
            Unassigned
            Reporter:
            fiebrig.vw Christian Fiebrig
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated:

                Sync Status

                Connection: RTFACT Sync
                RTMID-27252 -
                SYNCHRONIZED
                • Last Sync Date: